Agile Engineering and Integration

Slideshow Image Slideshow Image Slideshow Image Slideshow Image Slideshow Image Slideshow Image Slideshow Image Slideshow Image Slideshow Image Slideshow Image

Vulcan: Salisbury, MD

Murtech was contracted to complete the following: –        Removal and disposal of existing dolphin –        Installation of one new pile cluster dolphin –        Removal of existing rotted fender system and replacement  

Riverwalk: Salisbury, MD

Murtech was contracted to furnish all labor, materials, and equipment necessary for installing weep filters through the steel sheet bulkhead, and repairs to outfall pipes which extend through the steel sheet bulkhead along the Riverwalk in Salisbury, Maryland.  

Seaford, Delaware

Murtech contracted with Vulcan Materials Company for the installation of two (2) concrete filled Steel Tripod Pipe Pile Dolphins in locations as directed by Vulcan Materials.  The pictures depict the concrete pouring portion of this installation in Seaford, DE.  

Assateague State Park, Maryland

Murtech completed a boat ramp repair for the Assateague State Park in Maryland. Jobs included: ·         Removed and replaced sections of the damaged timber pier ·         Constructed a missing section of the timber pier ·         Constructed stone shoreline protection ·         Replaced section of concrete walkway ·         Installed timber pole ·         Grinded edges of concrete walkways 

Cape Charles, Virginia

In Cape Charles, Virginia, Murtech completed the installation of a 75 Ton Capacity Travel Lift.  Jobs included:   ·         Murtech engineers conducted a Design Analysis of the existing design, to accommodate a 75 Ton Capacity Travel Lift. ·         Murtech installed Timber Piles in groups to support the concrete deck. ·         Murtech constructed the forms, and placed […]